SABTANK - SECURITY PROJECT

Milestones Achieved:
  • Construction and Installation of Security Fence.
  • Supply and Installation of Road Blockers.
  • Supply and Installation of Turnstiles.
  • Supply and Installation of Arm Barriers.
  • Construction of Rooms for Security Personnel with Bullet Proof Glass Doors and Windows.

SABIC – WEATHER MONITORING SYSTEM

Milestones Achieved:
  • Site Survey, System Design and Installation of Weather monitoring system.
  • Weather Sensor in field installation.
  • Installation of Solar power system for backup.
  • UPS installation.
  • Supply and installation of Server and workstation.
  • Fiber optic installation, splicing and testing.
HSE
HSE

TASNEE – STEEL STRUCTURE

Milestones Achieved:
  • Site Survey, Design as per client requirement.
  • Fabrication and Installation of complete steel structure for Main Entrance and Staff Parking.
  • Construct and Install Sliding Gates.

SHARQ – CIVIL AND ELECTRICAL WORK

Milestones Achieved:
  • Site Survey.
  • Cable Routing Drawings preparation and approval.
  • Supply and Installation of cable trays.
  • Supply and Installation of Electrical cabling.
  • Testing and Commissioning.
HSE
HSE

SADAF PROJECT – OSP WORK FOR INTEGRATED SECURITY SYSTEMS

Milestones Achieved:
  • Site Survey
  • Engineering and Design
  • Trenching (Machine & Manual)
  • Installation of conduits and hand holes
  • Backfilling
  • SSD-1 Fence installation and refurbishment

SWCC YANBU POWER AND DESALINATION PLANT – PERIMETER FENCING

Milestones Achieved:
  • Site Survey.
  • Engineering and Design.
  • Class-1 Perimeter Fence Procurement and Installation.
  • Procurement and Installation of Emergency and Maintenance Gates.
HSE
HSE

SWCC JUBAIL – IDAS SYSTEM

Milestones Achieved:
  • Site Survey.
  • Design Drawings and Documentation.
  • Perimeter lighting supply and installation.
  • Physical Security such as: Road Blocker, Arm Barrier, Speed Humps installation.
  • Fixed and PTZ cameras supply and installation.
  • Supply and installation of Access Control System.
  • ID cards development and printing.
  • Video wall supply and installation for Command and Control Room.

MOF – DATACENTER CABLING

Milestones Achieved:
  • Site Survey.
  • Collection of data and mapping of all 70 nos. Server Racks.
  • Installation and termination of Cat6a cabling system.
  • Supply and Installation of Intelligent Patch Panels.
  • Patching and Organization of Patch Cords.
  • Testing and Commissioning.
  • Documentation and Site Handover.
HSE
HSE

MOH – MANPOWER SUPPLY

Milestones Achieved:
  • Locally arranged and mobilized 400 cleaners for MOH project.